docs(09): create phase plan
Phase 09: CI Pipeline Hardening - 4 plan(s) in 3 wave(s) - Wave 1: Infrastructure setup (09-01) - Wave 2: Tests in parallel (09-02, 09-03) - Wave 3: CI integration (09-04) - Ready for execution Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -106,11 +106,13 @@ Plans:
|
||||
3. Pipeline fails before Docker build when unit tests fail
|
||||
4. Pipeline fails before Docker build when type checking fails
|
||||
5. E2E tests run in pipeline using Playwright Docker image
|
||||
**Plans**: TBD
|
||||
**Plans**: 4 plans
|
||||
|
||||
Plans:
|
||||
- [ ] 09-01: Vitest setup and unit test structure
|
||||
- [ ] 09-02: Pipeline integration with fail-fast behavior
|
||||
- [ ] 09-01-PLAN.md — Test infrastructure setup (Vitest + browser mode)
|
||||
- [ ] 09-02-PLAN.md — Unit and component test suite with coverage
|
||||
- [ ] 09-03-PLAN.md — E2E test suite with database fixtures
|
||||
- [ ] 09-04-PLAN.md — CI pipeline integration with fail-fast behavior
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -127,13 +129,14 @@ Phases execute in numeric order: 7 -> 8 -> 9
|
||||
| 6. Deployment | v1.0 | 2/2 | Complete | 2026-02-01 |
|
||||
| 7. GitOps Foundation | v2.0 | 2/2 | Complete ✓ | 2026-02-03 |
|
||||
| 8. Observability Stack | v2.0 | 0/3 | Planned | - |
|
||||
| 9. CI Pipeline Hardening | v2.0 | 0/2 | Not started | - |
|
||||
| 9. CI Pipeline Hardening | v2.0 | 0/4 | Planned | - |
|
||||
|
||||
---
|
||||
*Roadmap created: 2026-01-29*
|
||||
*v2.0 phases added: 2026-02-03*
|
||||
*Phase 7 planned: 2026-02-03*
|
||||
*Phase 8 planned: 2026-02-03*
|
||||
*Phase 9 planned: 2026-02-03*
|
||||
*Depth: standard*
|
||||
*v1.0 Coverage: 31/31 requirements mapped*
|
||||
*v2.0 Coverage: 17/17 requirements mapped*
|
||||
|
||||