From 4c2e8fe36603b2a9e7effd513986c2b11f60cab1 Mon Sep 17 00:00:00 2001 From: Thomas Richter Date: Thu, 29 Jan 2026 04:35:31 +0100 Subject: [PATCH] docs(01-01): complete project setup and database schema plan Tasks completed: 2/2 - Task 1: Create SvelteKit project with dependencies - Task 2: Configure Drizzle schema with entries table SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md --- .planning/STATE.md | 27 +++-- .../phases/01-foundation/01-01-SUMMARY.md | 113 ++++++++++++++++++ 2 files changed, 128 insertions(+), 12 deletions(-) create mode 100644 .planning/phases/01-foundation/01-01-SUMMARY.md diff --git a/.planning/STATE.md b/.planning/STATE.md index 1166117..cecd9e5 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -10,27 +10,27 @@ See: .planning/PROJECT.md (updated 2026-01-29) ## Current Position Phase: 1 of 6 (Foundation) -Plan: 0 of 3 in current phase -Status: Ready to plan -Last activity: 2026-01-29 — Roadmap created +Plan: 1 of 3 in current phase +Status: In progress +Last activity: 2026-01-29 - Completed 01-01-PLAN.md -Progress: [░░░░░░░░░░] 0% +Progress: [█░░░░░░░░░] 6% ## Performance Metrics **Velocity:** -- Total plans completed: 0 -- Average duration: - -- Total execution time: 0 hours +- Total plans completed: 1 +- Average duration: 4 min +- Total execution time: 4 min **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| -| - | - | - | - | +| 01-foundation | 1 | 4 min | 4 min | **Recent Trend:** -- Last 5 plans: - +- Last 5 plans: 01-01 (4 min) - Trend: - *Updated after each plan completion* @@ -42,7 +42,10 @@ Progress: [░░░░░░░░░░] 0% Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: -- None yet (project just initialized) +- Tailwind CSS v4 with @tailwindcss/vite plugin (01-01) +- Unified entries table with type discriminator (01-01) +- SQLite database at ./data/taskplaner.db (01-01) +- WAL mode for concurrent reads (01-01) ### Pending Todos @@ -54,8 +57,8 @@ None yet. ## Session Continuity -Last session: 2026-01-29 -Stopped at: Roadmap created, ready for Phase 1 planning +Last session: 2026-01-29T03:34:40Z +Stopped at: Completed 01-01-PLAN.md Resume file: None --- diff --git a/.planning/phases/01-foundation/01-01-SUMMARY.md b/.planning/phases/01-foundation/01-01-SUMMARY.md new file mode 100644 index 0000000..13ca2c0 --- /dev/null +++ b/.planning/phases/01-foundation/01-01-SUMMARY.md @@ -0,0 +1,113 @@ +--- +phase: 01-foundation +plan: 01 +subsystem: database, infra +tags: [sveltekit, tailwind, drizzle, sqlite, typescript] + +# Dependency graph +requires: [] +provides: + - SvelteKit project structure with TypeScript + - Tailwind CSS v4 styling foundation + - Drizzle ORM schema with entries table + - Database connection with WAL mode +affects: [01-02, 01-03, 02-capture, 03-retrieval] + +# Tech tracking +tech-stack: + added: [sveltekit, svelte5, tailwindcss4, drizzle-orm, better-sqlite3, nanoid, zod] + patterns: [unified entries table with type discriminator] + +key-files: + created: + - src/lib/server/db/schema.ts + - src/lib/server/db/index.ts + - drizzle.config.ts + - src/app.css + modified: + - package.json + - vite.config.ts + - .gitignore + +key-decisions: + - "Tailwind CSS v4 with @tailwindcss/vite plugin" + - "Unified entries table with type enum (task/thought)" + - "SQLite database at ./data/taskplaner.db" + - "WAL mode for concurrent read performance" + +patterns-established: + - "Database files in src/lib/server/db/" + - "Drizzle kit scripts in package.json" + +# Metrics +duration: 4min +completed: 2026-01-29 +--- + +# Phase 01 Plan 01: Project Setup and Database Schema Summary + +**SvelteKit project with Tailwind CSS v4, Drizzle ORM, and unified entries table for task/thought storage** + +## Performance + +- **Duration:** 4 min 20 sec +- **Started:** 2026-01-29T03:30:20Z +- **Completed:** 2026-01-29T03:34:40Z +- **Tasks:** 2 +- **Files modified:** 16 created, 3 modified + +## Accomplishments + +- SvelteKit minimal template with TypeScript and Svelte 5 +- Tailwind CSS v4 configured with @tailwindcss/vite plugin +- Drizzle ORM schema defining unified entries table +- Database scripts for schema management (db:push, db:generate, etc.) +- All dependencies installed (better-sqlite3, nanoid, zod) + +## Task Commits + +Each task was committed atomically: + +1. **Task 1: Create SvelteKit project with dependencies** - `3a2e0f2` (feat) +2. **Task 2: Configure Drizzle schema with entries table** - `63c5e4b` (feat) + +## Files Created/Modified + +- `package.json` - Project dependencies and db scripts +- `vite.config.ts` - Tailwind plugin configuration +- `src/app.css` - Tailwind import +- `src/routes/+layout.svelte` - CSS import and layout +- `src/routes/+page.svelte` - Test page with Tailwind classes +- `src/lib/server/db/schema.ts` - Drizzle schema with entries table +- `src/lib/server/db/index.ts` - Database connection with WAL mode +- `drizzle.config.ts` - Drizzle kit configuration + +## Decisions Made + +- Used Tailwind CSS v4 with @tailwindcss/vite (latest approach, not PostCSS) +- Unified entries table with type discriminator ('task' | 'thought') rather than separate tables +- SQLite with better-sqlite3 for simple single-file database +- WAL mode enabled for better read concurrency + +## Deviations from Plan + +None - plan executed exactly as written. + +## Issues Encountered + +- `sv create` interactive prompts required CLI flags (--no-add-ons, --no-dir-check) +- drizzle-kit push requires data directory to exist first (created manually) + +## User Setup Required + +None - no external service configuration required. + +## Next Phase Readiness + +- Foundation complete with all dependencies +- Database schema ready for CRUD operations +- Ready for Plan 02 (API endpoints) and Plan 03 (UI components) + +--- +*Phase: 01-foundation* +*Completed: 2026-01-29*