Thomas Richter
0188483036
docs(03-02): complete file upload plan
...
Tasks completed: 3/3
- Add uploadImage form action with thumbnail generation
- Create ImageUpload component with drag-drop
- Integrate upload into QuickCapture
SUMMARY: .planning/phases/03-images/03-02-SUMMARY.md
2026-01-29 15:29:35 +01:00
Thomas Richter
19d2059c56
docs(03-03): complete camera capture plan
...
Tasks completed: 2/2
- CameraCapture component with getUserMedia
- Feature detection and graceful fallback
SUMMARY: .planning/phases/03-images/03-03-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 15:29:07 +01:00
Thomas Richter
e442b9ef0c
docs(03-01): complete image infrastructure plan
...
Tasks completed: 3/3
- Database schema and repository for images
- File storage and thumbnail generation utilities
- API endpoints for serving images
SUMMARY: .planning/phases/03-images/03-01-SUMMARY.md
2026-01-29 15:24:35 +01:00
Thomas Richter
6413c8e2d6
docs(02-04): complete mobile UX plan
...
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)
Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
2026-01-29 14:28:38 +01:00
Thomas Richter
969b6a71af
docs(02-03): complete inline editing plan
...
Tasks completed: 2/2
- Add expand/collapse and inline editing to EntryCard
- Create CompletedToggle component and wire up showCompleted
SUMMARY: .planning/phases/02-core-crud/02-03-SUMMARY.md
2026-01-29 11:14:09 +01:00
Thomas Richter
628f643197
docs(02-02): complete main UI components plan
...
Tasks completed: 3/3
- Install dependencies and create preferences store
- Create EntryCard and EntryList components
- Create QuickCapture component and integrate main page
SUMMARY: .planning/phases/02-core-crud/02-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 11:08:47 +01:00
Thomas Richter
e28ee2caf5
docs(02-01): complete CRUD form actions plan
...
Tasks completed: 3/3
- Extend repository with getOrdered method
- Create form actions for CRUD operations
- Establish accessible base styling
SUMMARY: .planning/phases/02-core-crud/02-01-SUMMARY.md
2026-01-29 11:04:11 +01:00
Thomas Richter
01a7a6230a
docs(01): complete foundation phase
...
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
2026-01-29 04:44:45 +01:00
Thomas Richter
f3fa1a07e9
docs(01-02): complete repository layer plan
...
Tasks completed: 2/2
- Create EntryRepository with typed CRUD operations
- Create data directory, server hooks, and verification page
SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-01-29 04:39:27 +01:00
Thomas Richter
4c2e8fe366
docs(01-01): complete project setup and database schema plan
...
Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table
SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
2026-01-29 04:35:31 +01:00
Thomas Richter
a5fe96ccab
docs: create roadmap (6 phases)
...
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)
All 31 v1 requirements mapped to phases.
2026-01-29 04:19:19 +01:00