Thomas Richter
6413c8e2d6
docs(02-04): complete mobile UX plan
...
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)
Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
2026-01-29 14:28:38 +01:00
Thomas Richter
969b6a71af
docs(02-03): complete inline editing plan
...
Tasks completed: 2/2
- Add expand/collapse and inline editing to EntryCard
- Create CompletedToggle component and wire up showCompleted
SUMMARY: .planning/phases/02-core-crud/02-03-SUMMARY.md
2026-01-29 11:14:09 +01:00
Thomas Richter
628f643197
docs(02-02): complete main UI components plan
...
Tasks completed: 3/3
- Install dependencies and create preferences store
- Create EntryCard and EntryList components
- Create QuickCapture component and integrate main page
SUMMARY: .planning/phases/02-core-crud/02-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 11:08:47 +01:00
Thomas Richter
e28ee2caf5
docs(02-01): complete CRUD form actions plan
...
Tasks completed: 3/3
- Extend repository with getOrdered method
- Create form actions for CRUD operations
- Establish accessible base styling
SUMMARY: .planning/phases/02-core-crud/02-01-SUMMARY.md
2026-01-29 11:04:11 +01:00
Thomas Richter
457cd407a8
docs(02): create phase plan
...
Phase 02: Core CRUD
- 4 plans in 4 waves
- 3 parallel-ready (Wave 1-3 sequential), 1 checkpoint
- Ready for execution
2026-01-29 05:27:31 +01:00
Thomas Richter
4036457391
docs(02): research phase domain
...
Phase 02: Core CRUD
- Standard stack identified (SvelteKit form actions, svelte-gestures)
- Architecture patterns documented (progressive enhancement, inline editing)
- Pitfalls catalogued (reactivity, debounce, mobile-first)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 05:22:10 +01:00
Thomas Richter
a64df52f93
docs(02): capture phase context
...
Phase 02: Core CRUD
- Quick capture: fixed bottom, title+content, remember last type
- Layout: mixed cards/compact, tasks then thoughts, hide completed
- Editing: inline expand, auto-save, swipe to delete
2026-01-29 05:11:54 +01:00
Thomas Richter
01a7a6230a
docs(01): complete foundation phase
...
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
2026-01-29 04:44:45 +01:00
Thomas Richter
f3fa1a07e9
docs(01-02): complete repository layer plan
...
Tasks completed: 2/2
- Create EntryRepository with typed CRUD operations
- Create data directory, server hooks, and verification page
SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-01-29 04:39:27 +01:00
Thomas Richter
4c2e8fe366
docs(01-01): complete project setup and database schema plan
...
Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table
SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
2026-01-29 04:35:31 +01:00
Thomas Richter
92e0d5188a
docs(01): create phase 1 foundation plans
...
Phase 01: Foundation
- 2 plans in 2 waves
- Wave 1: Project setup with SvelteKit + Drizzle schema
- Wave 2: Repository layer + verification page
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 04:26:48 +01:00
Thomas Richter
f7634d9956
docs(01): capture phase context
...
Phase 01: Foundation
- User skipped discussion (infrastructure phase)
- Claude has discretion following research recommendations
2026-01-29 04:22:25 +01:00