Thomas Richter
|
8c3dc137ca
|
docs(08): create phase plan
Phase 08: Observability Stack
- 3 plans in 2 waves
- Wave 1: 08-01 (metrics), 08-02 (Alloy) - parallel
- Wave 2: 08-03 (verification) - depends on both
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-02-03 21:24:24 +01:00 |
|
Thomas Richter
|
3d11a090be
|
docs(07): complete GitOps Foundation phase
Phase 7 verified:
- GITOPS-01: ArgoCD server running ✓
- GITOPS-02: Auto-sync verified (137s response time) ✓
- GITOPS-03: Self-heal verified (pod restored) ✓
- GITOPS-04: ArgoCD UI accessible ✓
All 5/5 must-haves passed.
|
2026-02-03 20:04:52 +01:00 |
|
Thomas Richter
|
1d4302d5bf
|
docs(07): create phase plan
Phase 07: GitOps Foundation
- 2 plan(s) in 2 wave(s)
- Wave 1: 07-01 (register application)
- Wave 2: 07-02 (verify gitops behavior)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-02-03 14:54:41 +01:00 |
|
Thomas Richter
|
27ed813413
|
docs: create milestone v2.0 roadmap (3 phases)
Phases:
7. GitOps Foundation: ArgoCD installation and configuration
8. Observability Stack: Prometheus/Grafana/Loki + alerts
9. CI Pipeline Hardening: Vitest, Playwright, type checking
All 17 requirements mapped to phases.
|
2026-02-03 14:41:43 +01:00 |
|
Thomas Richter
|
89e703daa5
|
docs(06): complete deployment phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-02-01 13:29:06 +01:00 |
|
Thomas Richter
|
80e4769221
|
docs(06): create phase plan
Phase 06: Deployment
- 2 plans in 2 waves
- Wave 1: Docker configuration (adapter-node, Dockerfile, docker-compose)
- Wave 2: Runtime configuration (health endpoint, env docs, backup script)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-02-01 13:06:33 +01:00 |
|
Thomas Richter
|
4a5e9ff04f
|
docs(05): complete search phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 17:24:36 +01:00 |
|
Thomas Richter
|
f6144f4edf
|
docs(05): create phase plan
Phase 05: Search
- 3 plans in 2 waves
- Wave 1: 05-01 (UI components), 05-02 (filtering logic) — parallel
- Wave 2: 05-03 (integration + recent searches + "/" shortcut)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 14:15:38 +01:00 |
|
Thomas Richter
|
26619ecbe3
|
docs(04): complete Tags & Organization phase
- All 3 plans executed (04-01, 04-02, 04-03)
- 7/7 success criteria verified
- 7 requirements completed (TAG-01-04, ORG-01-03)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 13:14:10 +01:00 |
|
Thomas Richter
|
4fe198eb0a
|
docs(04): create phase plan
Phase 04: Tags & Organization
- 3 plan(s) in 2 wave(s)
- Wave 1: 04-01 (tags schema), 04-02 (pin/due date) - parallel
- Wave 2: 04-03 (tag UI) - depends on 04-01
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 12:49:53 +01:00 |
|
Thomas Richter
|
ea50fe9820
|
docs(03): complete Phase 3 Images
- All 4 plans executed successfully
- 5/5 success criteria verified
- CameraCapture replaced with native file input for HTTP compatibility
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 12:23:24 +01:00 |
|
Thomas Richter
|
04c2742e73
|
docs(03): create phase plan
Phase 03: Images
- 4 plan(s) in 3 wave(s)
- Wave 1: 03-01 (foundation)
- Wave 2: 03-02, 03-03 (parallel - upload + camera)
- Wave 3: 03-04 (integration + verification)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 15:15:30 +01:00 |
|
Thomas Richter
|
6413c8e2d6
|
docs(02-04): complete mobile UX plan
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)
Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
|
2026-01-29 14:28:38 +01:00 |
|
Thomas Richter
|
457cd407a8
|
docs(02): create phase plan
Phase 02: Core CRUD
- 4 plans in 4 waves
- 3 parallel-ready (Wave 1-3 sequential), 1 checkpoint
- Ready for execution
|
2026-01-29 05:27:31 +01:00 |
|
Thomas Richter
|
01a7a6230a
|
docs(01): complete foundation phase
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
|
2026-01-29 04:44:45 +01:00 |
|
Thomas Richter
|
92e0d5188a
|
docs(01): create phase 1 foundation plans
Phase 01: Foundation
- 2 plans in 2 waves
- Wave 1: Project setup with SvelteKit + Drizzle schema
- Wave 2: Repository layer + verification page
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 04:26:48 +01:00 |
|
Thomas Richter
|
a5fe96ccab
|
docs: create roadmap (6 phases)
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)
All 31 v1 requirements mapped to phases.
|
2026-01-29 04:19:19 +01:00 |
|