Thomas Richter
4abff06d26
docs(06-02): complete runtime configuration plan
...
Tasks completed: 3/3
- Create health check endpoint
- Create environment documentation and backup script
- Add Docker deployment section to README
SUMMARY: .planning/phases/06-deployment/06-02-SUMMARY.md
2026-02-01 13:25:23 +01:00
Thomas Richter
8947ba30f0
docs(06-01): complete docker configuration plan
...
Tasks completed: 3/3
- Switch to adapter-node with environment prefix
- Create Docker configuration files
- Update data paths for environment variable configuration
SUMMARY: .planning/phases/06-deployment/06-01-SUMMARY.md
2026-02-01 13:21:52 +01:00
Thomas Richter
311bfeaca4
docs(05-03): complete search integration plan
...
Tasks completed: 3/3
- Create recent searches store and add dropdown UI
- Integrate filtering into EntryList with flat list mode
- Add highlighting to EntryCard and integrate search UI
SUMMARY: .planning/phases/05-search/05-03-SUMMARY.md
2026-01-31 17:20:10 +01:00
Thomas Richter
6090d78824
docs(05-01): complete search UI components plan
...
Tasks completed: 3/3
- Create search types and utility functions
- Create SearchBar component with debounced input
- Create FilterBar component with type, tag, date controls
SUMMARY: .planning/phases/05-search/05-01-SUMMARY.md
2026-01-31 17:14:42 +01:00
Thomas Richter
628312dbd9
docs(05-02): complete filtering utilities plan
...
Tasks completed: 2/2
- Create filterEntries utility function
- Create highlightText utility function
SUMMARY: .planning/phases/05-search/05-02-SUMMARY.md
2026-01-31 17:13:47 +01:00
Thomas Richter
e924839ee4
docs(04-03): complete tag input UI plan
...
Tasks completed: 2/2
- Install Svelecte and update load/actions for tags
- Create TagInput component and integrate into EntryCard
SUMMARY: .planning/phases/04-tags/04-03-SUMMARY.md
2026-01-31 13:10:39 +01:00
Thomas Richter
66fc04efe7
docs(04-01): complete tag schema and repository plan
...
Tasks completed: 2/2
- Add tags schema with case-insensitive unique index
- Create tagRepository with tag operations
SUMMARY: .planning/phases/04-tags/04-01-SUMMARY.md
2026-01-31 13:05:30 +01:00
Thomas Richter
7539d1591a
docs(04-02): complete pin/favorite and due date plan
...
Tasks completed: 2/2
- Add togglePin and updateDueDate form actions
- Add pin button, due date picker, and pinned section UI
SUMMARY: .planning/phases/04-tags/04-02-SUMMARY.md
2026-01-31 13:05:04 +01:00
Thomas Richter
c78330ad35
docs(03-04): complete gallery integration plan
...
Tasks completed: 4/4
- ImageGallery and ImageLightbox components
- Integrate images into EntryCard
- Delete image form action
- Human verification (approved)
Fix: Camera button replaced with file input capture="environment"
SUMMARY: .planning/phases/03-images/03-04-SUMMARY.md
2026-01-31 12:20:06 +01:00
Thomas Richter
0188483036
docs(03-02): complete file upload plan
...
Tasks completed: 3/3
- Add uploadImage form action with thumbnail generation
- Create ImageUpload component with drag-drop
- Integrate upload into QuickCapture
SUMMARY: .planning/phases/03-images/03-02-SUMMARY.md
2026-01-29 15:29:35 +01:00
Thomas Richter
19d2059c56
docs(03-03): complete camera capture plan
...
Tasks completed: 2/2
- CameraCapture component with getUserMedia
- Feature detection and graceful fallback
SUMMARY: .planning/phases/03-images/03-03-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 15:29:07 +01:00
Thomas Richter
e442b9ef0c
docs(03-01): complete image infrastructure plan
...
Tasks completed: 3/3
- Database schema and repository for images
- File storage and thumbnail generation utilities
- API endpoints for serving images
SUMMARY: .planning/phases/03-images/03-01-SUMMARY.md
2026-01-29 15:24:35 +01:00
Thomas Richter
6413c8e2d6
docs(02-04): complete mobile UX plan
...
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)
Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
2026-01-29 14:28:38 +01:00
Thomas Richter
969b6a71af
docs(02-03): complete inline editing plan
...
Tasks completed: 2/2
- Add expand/collapse and inline editing to EntryCard
- Create CompletedToggle component and wire up showCompleted
SUMMARY: .planning/phases/02-core-crud/02-03-SUMMARY.md
2026-01-29 11:14:09 +01:00
Thomas Richter
628f643197
docs(02-02): complete main UI components plan
...
Tasks completed: 3/3
- Install dependencies and create preferences store
- Create EntryCard and EntryList components
- Create QuickCapture component and integrate main page
SUMMARY: .planning/phases/02-core-crud/02-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 11:08:47 +01:00
Thomas Richter
e28ee2caf5
docs(02-01): complete CRUD form actions plan
...
Tasks completed: 3/3
- Extend repository with getOrdered method
- Create form actions for CRUD operations
- Establish accessible base styling
SUMMARY: .planning/phases/02-core-crud/02-01-SUMMARY.md
2026-01-29 11:04:11 +01:00
Thomas Richter
01a7a6230a
docs(01): complete foundation phase
...
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
2026-01-29 04:44:45 +01:00
Thomas Richter
f3fa1a07e9
docs(01-02): complete repository layer plan
...
Tasks completed: 2/2
- Create EntryRepository with typed CRUD operations
- Create data directory, server hooks, and verification page
SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-01-29 04:39:27 +01:00
Thomas Richter
4c2e8fe366
docs(01-01): complete project setup and database schema plan
...
Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table
SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
2026-01-29 04:35:31 +01:00
Thomas Richter
a5fe96ccab
docs: create roadmap (6 phases)
...
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)
All 31 v1 requirements mapped to phases.
2026-01-29 04:19:19 +01:00