Thomas Richter
|
01a7a6230a
|
docs(01): complete foundation phase
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
|
2026-01-29 04:44:45 +01:00 |
|
Thomas Richter
|
f3fa1a07e9
|
docs(01-02): complete repository layer plan
Tasks completed: 2/2
- Create EntryRepository with typed CRUD operations
- Create data directory, server hooks, and verification page
SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
|
2026-01-29 04:39:27 +01:00 |
|
Thomas Richter
|
4c2e8fe366
|
docs(01-01): complete project setup and database schema plan
Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table
SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
|
2026-01-29 04:35:31 +01:00 |
|
Thomas Richter
|
92e0d5188a
|
docs(01): create phase 1 foundation plans
Phase 01: Foundation
- 2 plans in 2 waves
- Wave 1: Project setup with SvelteKit + Drizzle schema
- Wave 2: Repository layer + verification page
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 04:26:48 +01:00 |
|
Thomas Richter
|
f7634d9956
|
docs(01): capture phase context
Phase 01: Foundation
- User skipped discussion (infrastructure phase)
- Claude has discretion following research recommendations
|
2026-01-29 04:22:25 +01:00 |
|
Thomas Richter
|
a5fe96ccab
|
docs: create roadmap (6 phases)
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)
All 31 v1 requirements mapped to phases.
|
2026-01-29 04:19:19 +01:00 |
|
Thomas Richter
|
b0ebe674ad
|
docs: define v1 requirements
31 requirements across 8 categories:
- Core (6): CRUD, task/thought distinction, completion
- Images (4): attachments, camera capture, view/remove
- Tags (4): add/remove, autocomplete, case-insensitive
- Organization (3): pin/favorite, due dates
- Search (4): full-text, tag filter, date filter, type filter
- Capture (3): quick capture mode
- UX (3): mobile, readable fonts, browser support
- Deployment (4): Docker, env config, volumes
10 requirements deferred to v2
11 features explicitly out of scope
|
2026-01-29 03:57:15 +01:00 |
|
Thomas Richter
|
4e7c20b3ad
|
docs: complete project research
Files:
- STACK.md - SvelteKit + SQLite + TypeScript stack recommendation
- FEATURES.md - Feature landscape with MVP definition
- ARCHITECTURE.md - Modular monolith architecture with repository pattern
- PITFALLS.md - Critical pitfalls and prevention strategies
- SUMMARY.md - Executive synthesis with roadmap implications
Key findings:
- Stack: SvelteKit 2.50.x + Svelte 5.49.x with SQLite and better-sqlite3 for single-user simplicity
- Architecture: Modular monolith with content-addressable image storage, FTS5 for search
- Critical pitfall: Store images on filesystem (not DB) from Phase 1 to avoid painful migration
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 03:38:41 +01:00 |
|
Thomas Richter
|
f7df924719
|
chore: add project config
Mode: yolo
Depth: standard
Parallelization: enabled
Workflow agents: research=on, plan_check=on, verifier=on
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 03:28:24 +01:00 |
|
Thomas Richter
|
1681a6a59c
|
docs: initialize project
Personal web app for tasks and thoughts with image attachments, accessible from any device.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 03:26:00 +01:00 |
|