Thomas Richter
|
4fe198eb0a
|
docs(04): create phase plan
Phase 04: Tags & Organization
- 3 plan(s) in 2 wave(s)
- Wave 1: 04-01 (tags schema), 04-02 (pin/due date) - parallel
- Wave 2: 04-03 (tag UI) - depends on 04-01
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 12:49:53 +01:00 |
|
Thomas Richter
|
ea50fe9820
|
docs(03): complete Phase 3 Images
- All 4 plans executed successfully
- 5/5 success criteria verified
- CameraCapture replaced with native file input for HTTP compatibility
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-31 12:23:24 +01:00 |
|
Thomas Richter
|
04c2742e73
|
docs(03): create phase plan
Phase 03: Images
- 4 plan(s) in 3 wave(s)
- Wave 1: 03-01 (foundation)
- Wave 2: 03-02, 03-03 (parallel - upload + camera)
- Wave 3: 03-04 (integration + verification)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 15:15:30 +01:00 |
|
Thomas Richter
|
6413c8e2d6
|
docs(02-04): complete mobile UX plan
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)
Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
|
2026-01-29 14:28:38 +01:00 |
|
Thomas Richter
|
457cd407a8
|
docs(02): create phase plan
Phase 02: Core CRUD
- 4 plans in 4 waves
- 3 parallel-ready (Wave 1-3 sequential), 1 checkpoint
- Ready for execution
|
2026-01-29 05:27:31 +01:00 |
|
Thomas Richter
|
01a7a6230a
|
docs(01): complete foundation phase
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready
Ready for Phase 2: Core CRUD
|
2026-01-29 04:44:45 +01:00 |
|
Thomas Richter
|
92e0d5188a
|
docs(01): create phase 1 foundation plans
Phase 01: Foundation
- 2 plans in 2 waves
- Wave 1: Project setup with SvelteKit + Drizzle schema
- Wave 2: Repository layer + verification page
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
|
2026-01-29 04:26:48 +01:00 |
|
Thomas Richter
|
a5fe96ccab
|
docs: create roadmap (6 phases)
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)
All 31 v1 requirements mapped to phases.
|
2026-01-29 04:19:19 +01:00 |
|