Commit Graph

10 Commits

Author SHA1 Message Date
Thomas Richter
3d11a090be docs(07): complete GitOps Foundation phase
Phase 7 verified:
- GITOPS-01: ArgoCD server running ✓
- GITOPS-02: Auto-sync verified (137s response time) ✓
- GITOPS-03: Self-heal verified (pod restored) ✓
- GITOPS-04: ArgoCD UI accessible ✓

All 5/5 must-haves passed.
2026-02-03 20:04:52 +01:00
Thomas Richter
27ed813413 docs: create milestone v2.0 roadmap (3 phases)
Phases:
7. GitOps Foundation: ArgoCD installation and configuration
8. Observability Stack: Prometheus/Grafana/Loki + alerts
9. CI Pipeline Hardening: Vitest, Playwright, type checking

All 17 requirements mapped to phases.
2026-02-03 14:41:43 +01:00
Thomas Richter
34b1c05146 docs: define milestone v2.0 requirements
17 requirements across 3 categories:
- GitOps: 4 (ArgoCD installation and configuration)
- Observability: 8 (Prometheus/Grafana/Loki stack + app metrics)
- CI Testing: 5 (Vitest, Playwright, type checking)
2026-02-03 13:27:31 +01:00
Thomas Richter
37023b2605 docs: complete milestone v1.0 archival
- Archive roadmap, requirements, and audit to .planning/milestones/
- Update PROJECT.md with validated requirements and decisions
- Reset STATE.md for next milestone cycle
- Create MILESTONES.md for project history

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-01 17:15:53 +01:00
Thomas Richter
89e703daa5 docs(06): complete deployment phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-01 13:29:06 +01:00
Thomas Richter
4a5e9ff04f docs(05): complete search phase
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-31 17:24:36 +01:00
Thomas Richter
26619ecbe3 docs(04): complete Tags & Organization phase
- All 3 plans executed (04-01, 04-02, 04-03)
- 7/7 success criteria verified
- 7 requirements completed (TAG-01-04, ORG-01-03)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-31 13:14:10 +01:00
Thomas Richter
39ed266b15 docs(02): complete Core CRUD phase
- 12 requirements verified complete (CORE-01-06, CAPT-01-03, UX-01-03)
- 8/8 success criteria passed
- User approved mobile UX at checkpoint

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-29 14:31:52 +01:00
Thomas Richter
a5fe96ccab docs: create roadmap (6 phases)
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)

All 31 v1 requirements mapped to phases.
2026-01-29 04:19:19 +01:00
Thomas Richter
b0ebe674ad docs: define v1 requirements
31 requirements across 8 categories:
- Core (6): CRUD, task/thought distinction, completion
- Images (4): attachments, camera capture, view/remove
- Tags (4): add/remove, autocomplete, case-insensitive
- Organization (3): pin/favorite, due dates
- Search (4): full-text, tag filter, date filter, type filter
- Capture (3): quick capture mode
- UX (3): mobile, readable fonts, browser support
- Deployment (4): Docker, env config, volumes

10 requirements deferred to v2
11 features explicitly out of scope
2026-01-29 03:57:15 +01:00