Files
taskplaner/.planning/milestones/v1.0-AUDIT.md
Thomas Richter 37023b2605 docs: complete milestone v1.0 archival
- Archive roadmap, requirements, and audit to .planning/milestones/
- Update PROJECT.md with validated requirements and decisions
- Reset STATE.md for next milestone cycle
- Create MILESTONES.md for project history

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-01 17:15:53 +01:00

7.2 KiB

milestone, audited, status, scores, gaps, tech_debt
milestone audited status scores gaps tech_debt
v1 2026-02-01T14:50:00Z passed
requirements phases integration flows
31/31 6/6 27/28 5/5
requirements integration flows
phase items
03-images
Orphaned: CameraCapture.svelte (replaced with file input, 313 lines unused)
phase items
all
15 TypeScript warnings (non-blocking svelte-check warnings about state initialization)

TaskPlanner v1 Milestone Audit Report

Audited: 2026-02-01 Status: PASSED Verdict: All requirements satisfied, all phases verified, excellent integration

Executive Summary

TaskPlanner milestone v1 is production-ready. All 31 requirements are satisfied across 6 phases with excellent cross-phase integration (96%) and complete E2E user flows (100%). Minor tech debt exists but does not affect functionality.

Scores

Category Score Status
Requirements 31/31 100% SATISFIED
Phases 6/6 100% VERIFIED
Integration 27/28 96% CONNECTED
E2E Flows 5/5 100% COMPLETE

Requirements Coverage

Core (6/6) ✓

Req Description Phase Status
CORE-01 User can create a new entry Phase 2 SATISFIED
CORE-02 User can edit an existing entry Phase 2 SATISFIED
CORE-03 User can delete an entry Phase 2 SATISFIED
CORE-04 User can mark entry as task or thought Phase 2 SATISFIED
CORE-05 User can mark a task as complete Phase 2 SATISFIED
CORE-06 User can add notes to an entry Phase 2 SATISFIED

Images (4/4) ✓

Req Description Phase Status
IMG-01 Attach images via file upload Phase 3 SATISFIED
IMG-02 Attach images via camera capture Phase 3 SATISFIED
IMG-03 View attached images on entry Phase 3 SATISFIED
IMG-04 Remove image attachments Phase 3 SATISFIED

Tags (4/4) ✓

Req Description Phase Status
TAG-01 Add tags to an entry Phase 4 SATISFIED
TAG-02 Remove tags from an entry Phase 4 SATISFIED
TAG-03 Autocomplete from existing tags Phase 4 SATISFIED
TAG-04 Case-insensitive tags Phase 4 SATISFIED

Organization (3/3) ✓

Req Description Phase Status
ORG-01 Pin/favorite entries Phase 4 SATISFIED
ORG-02 Set due date on tasks Phase 4 SATISFIED
ORG-03 Pinned section at top Phase 4 SATISFIED

Search (4/4) ✓

Req Description Phase Status
SRCH-01 Search by text in title/content Phase 5 SATISFIED
SRCH-02 Filter by tag Phase 5 SATISFIED
SRCH-03 Filter by date range Phase 5 SATISFIED
SRCH-04 Filter by type (task/thought) Phase 5 SATISFIED

Capture (3/3) ✓

Req Description Phase Status
CAPT-01 Quick capture with minimal friction Phase 2 SATISFIED
CAPT-02 Default to thought type Phase 2 SATISFIED
CAPT-03 Accessible from main view Phase 2 SATISFIED

UX (3/3) ✓

Req Description Phase Status
UX-01 Mobile-friendly UI Phase 2 SATISFIED
UX-02 Readable fonts for older eyes Phase 2 SATISFIED
UX-03 Cross-browser compatibility Phase 2 SATISFIED

Deployment (4/4) ✓

Req Description Phase Status
DEPLOY-01 App runs in Docker container Phase 6 SATISFIED
DEPLOY-02 Configuration via env variables Phase 6 SATISFIED
DEPLOY-03 Data persists via named volumes Phase 6 SATISFIED
DEPLOY-04 Single docker-compose.yml Phase 6 SATISFIED

Phase Verification Summary

Phase Name Truths Verified Status
01 Foundation 11/11 PASSED
02 Core CRUD 8/8 PASSED
03 Images 5/5 PASSED
04 Tags 7/7 PASSED
05 Search 5/5 PASSED
06 Deployment 5/5 PASSED

Total: 41/41 truths verified across all phases

Integration Analysis

Phase-to-Phase Wiring

Connection Status Evidence
Phase 1 → 2: DB/Repository ✓ CONNECTED +page.server.ts imports entryRepository
Phase 2 → 3: Entry + Images ✓ CONNECTED images table with entryId FK, uploadImage action
Phase 2 → 4: Entry + Tags ✓ CONNECTED entryTags junction, tagRepository.updateEntryTags
Phase 4 → 5: Tags → Filter ✓ CONNECTED FilterBar uses availableTags, filterEntries checks tags
Phase 1-5 → 6: Docker ✓ CONNECTED All features in container, health check verifies DB

E2E User Flows

Flow Description Status
Quick Capture Type → Add → Entry appears ✓ COMPLETE
Image Capture Upload → Thumbnail → Lightbox ✓ COMPLETE
Organization Pin entries → Pinned section ✓ COMPLETE
Search Type → Filter → Highlight ✓ COMPLETE
Cross-Device Docker → Browser access ✓ COMPLETE

Orphaned Code

File Reason Impact
CameraCapture.svelte Replaced with file input in Phase 03-04 None - unused

Tech Debt Summary

Total items: 2 Blocking: 0

Phase 03: Images

  • Orphaned CameraCapture.svelte - 313 lines created in Phase 03-03, replaced in Phase 03-04 with file input approach. File exists but never imported. Recommend deletion.

All Phases

  • 15 TypeScript warnings - Svelte-check reports state initialization warnings. These are non-blocking informational warnings about capturing initial prop values. Functionality unaffected.

User Acceptance Testing

Phase 06 UAT (2026-02-01)

Test Result
Docker build succeeds PASS
Container starts and runs PASS
Application accessible PASS
Health endpoint returns 200 PASS
Data persists across restart PASS
Backup script creates archive PASS

Issues fixed during UAT:

  1. Container restart loop → Fixed by renaming TASKPLANER_DATA_DIR to DATA_DIR
  2. 403 on form submission → Fixed by adding TASKPLANER_ORIGIN to docker-compose.yml
  3. Database tables missing → Fixed by adding auto-init in db/index.ts

E2E tests added: 5 Playwright tests covering Docker deployment

Production Readiness

Aspect Status Notes
Docker deployment ✓ Ready Multi-stage build, non-root user
Health monitoring ✓ Ready /health endpoint with DB check
Data persistence ✓ Ready Named volume for DB + images
Environment config ✓ Ready TASKPLANER_* prefix documented
Backup/restore ✓ Ready backup.sh with volume tar
CSRF protection ✓ Ready TASKPLANER_ORIGIN configured
E2E test coverage ✓ Ready Playwright tests for Docker

Recommendation

PROCEED TO MILESTONE COMPLETION

All requirements satisfied. All phases verified. Excellent integration. Minor tech debt can be addressed post-release.


Audited: 2026-02-01 Integration checker: gsd-integration-checker