Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-02-01)
Core value: Capture and find anything from any device — especially laptop. If cross-device capture with images doesn't work, nothing else matters. Current focus: v2.0 Production Operations — Phase 9 (CI Pipeline Hardening)
Current Position
Phase: 9 of 9 (CI Pipeline Hardening) Plan: 3 of 4 in current phase Status: In progress Last activity: 2026-02-03 — Completed 09-03-PLAN.md (E2E Test Suite)
Progress: [██████████████████████████████] 100% (26/26 plans complete)
Performance Metrics
v1.0 Summary:
- Total plans completed: 18
- Average duration: 3.3 min
- Total execution time: 60 min
- Phases: 6
- Requirements satisfied: 31/31
v2.0 Progress:
- Plans completed: 8/8
- Total execution time: 57 min
By Phase (v1.0):
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-foundation | 2 | 7 min | 3.5 min |
| 02-core-crud | 4 | 15 min | 3.75 min |
| 03-images | 4 | 14 min | 3.5 min |
| 04-tags | 3 | 13 min | 4.3 min |
| 05-search | 3 | 7 min | 2.3 min |
| 06-deployment | 2 | 4 min | 2 min |
By Phase (v2.0):
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 07-gitops-foundation | 2/2 | 26 min | 13 min |
| 08-observability-stack | 3/3 | 18 min | 6 min |
| 09-ci-pipeline | 3/4 | 13 min | 4.3 min |
Accumulated Context
Decisions
Key decisions from v1.0 are preserved in PROJECT.md.
For v2.0, key decisions from research:
- Use Grafana Alloy (not Promtail - EOL March 2026)
- ArgoCD needs server.insecure: true for Traefik TLS termination
- Loki monolithic mode with 7-day retention
- Vitest for unit tests (official Svelte recommendation)
From Phase 7-01:
- Repository path: admin/taskplaner (Gitea user namespace, not tho/)
- Internal URLs: Use cluster-internal Gitea service for ArgoCD repo access
- Secret management: Credentials not committed to Git, created via kubectl
From Phase 7-02:
- GitOps verification pattern: Use pod annotation changes for non-destructive sync testing
- ArgoCD health "Progressing" is display issue, not functional problem
From Phase 8-01:
- Use prom-client default metrics only (no custom metrics for initial setup)
- ServiceMonitor enabled by default in values.yaml
From Phase 8-02:
- Alloy uses River config language (not YAML)
- Match Promtail labels for Loki query compatibility
- Control-plane node tolerations required for full DaemonSet coverage
From Phase 8-03:
- Loki datasource isDefault must be false when Prometheus is default datasource
- ServiceMonitor needs
release: kube-prometheus-stacklabel for discovery
From Phase 9-01:
- Multi-project Vitest: browser (client) vs node (server) test environments
- Coverage thresholds with autoUpdate initially (no hard threshold yet)
- SvelteKit mocks use simple vi.mock, not importOriginal (avoids SSR issues)
- v8 coverage provider (10x faster than istanbul)
From Phase 9-02:
- Coverage thresholds: statements 10%, branches 5%, functions 20%, lines 8%
- Target 80% coverage, thresholds increase incrementally
- Import page from 'vitest/browser' (not deprecated @vitest/browser/context)
- SvelteKit mocks centralized in vitest-setup-client.ts
From Phase 9-03:
- Single worker for E2E to avoid database race conditions
- Separate Playwright config for Docker deployment tests
- Manual SQL cleanup instead of drizzle-seed reset (better type compatibility)
Pending Todos
- Deploy Gitea Actions runner for automatic CI builds
Blockers/Concerns
- Gitea Actions workflows stuck in "queued" - no runner available
- ArgoCD health shows "Progressing" despite pod healthy (display issue, not blocking)
Session Continuity
Last session: 2026-02-03 22:38 UTC Stopped at: Completed 09-03-PLAN.md (E2E Test Suite) Resume file: None
State initialized: 2026-01-29 Last updated: 2026-02-03 — Completed 09-03-PLAN.md (E2E Test Suite)