docs(01-01): complete project setup and database schema plan

Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table

SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
This commit is contained in:
Thomas Richter
2026-01-29 04:35:31 +01:00
parent 63c5e4bddc
commit 4c2e8fe366
2 changed files with 128 additions and 12 deletions

View File

@@ -10,27 +10,27 @@ See: .planning/PROJECT.md (updated 2026-01-29)
## Current Position ## Current Position
Phase: 1 of 6 (Foundation) Phase: 1 of 6 (Foundation)
Plan: 0 of 3 in current phase Plan: 1 of 3 in current phase
Status: Ready to plan Status: In progress
Last activity: 2026-01-29 — Roadmap created Last activity: 2026-01-29 - Completed 01-01-PLAN.md
Progress: [░░░░░░░░░] 0% Progress: [░░░░░░░░░] 6%
## Performance Metrics ## Performance Metrics
**Velocity:** **Velocity:**
- Total plans completed: 0 - Total plans completed: 1
- Average duration: - - Average duration: 4 min
- Total execution time: 0 hours - Total execution time: 4 min
**By Phase:** **By Phase:**
| Phase | Plans | Total | Avg/Plan | | Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------| |-------|-------|-------|----------|
| - | - | - | - | | 01-foundation | 1 | 4 min | 4 min |
**Recent Trend:** **Recent Trend:**
- Last 5 plans: - - Last 5 plans: 01-01 (4 min)
- Trend: - - Trend: -
*Updated after each plan completion* *Updated after each plan completion*
@@ -42,7 +42,10 @@ Progress: [░░░░░░░░░░] 0%
Decisions are logged in PROJECT.md Key Decisions table. Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work: Recent decisions affecting current work:
- None yet (project just initialized) - Tailwind CSS v4 with @tailwindcss/vite plugin (01-01)
- Unified entries table with type discriminator (01-01)
- SQLite database at ./data/taskplaner.db (01-01)
- WAL mode for concurrent reads (01-01)
### Pending Todos ### Pending Todos
@@ -54,8 +57,8 @@ None yet.
## Session Continuity ## Session Continuity
Last session: 2026-01-29 Last session: 2026-01-29T03:34:40Z
Stopped at: Roadmap created, ready for Phase 1 planning Stopped at: Completed 01-01-PLAN.md
Resume file: None Resume file: None
--- ---

View File

@@ -0,0 +1,113 @@
---
phase: 01-foundation
plan: 01
subsystem: database, infra
tags: [sveltekit, tailwind, drizzle, sqlite, typescript]
# Dependency graph
requires: []
provides:
- SvelteKit project structure with TypeScript
- Tailwind CSS v4 styling foundation
- Drizzle ORM schema with entries table
- Database connection with WAL mode
affects: [01-02, 01-03, 02-capture, 03-retrieval]
# Tech tracking
tech-stack:
added: [sveltekit, svelte5, tailwindcss4, drizzle-orm, better-sqlite3, nanoid, zod]
patterns: [unified entries table with type discriminator]
key-files:
created:
- src/lib/server/db/schema.ts
- src/lib/server/db/index.ts
- drizzle.config.ts
- src/app.css
modified:
- package.json
- vite.config.ts
- .gitignore
key-decisions:
- "Tailwind CSS v4 with @tailwindcss/vite plugin"
- "Unified entries table with type enum (task/thought)"
- "SQLite database at ./data/taskplaner.db"
- "WAL mode for concurrent read performance"
patterns-established:
- "Database files in src/lib/server/db/"
- "Drizzle kit scripts in package.json"
# Metrics
duration: 4min
completed: 2026-01-29
---
# Phase 01 Plan 01: Project Setup and Database Schema Summary
**SvelteKit project with Tailwind CSS v4, Drizzle ORM, and unified entries table for task/thought storage**
## Performance
- **Duration:** 4 min 20 sec
- **Started:** 2026-01-29T03:30:20Z
- **Completed:** 2026-01-29T03:34:40Z
- **Tasks:** 2
- **Files modified:** 16 created, 3 modified
## Accomplishments
- SvelteKit minimal template with TypeScript and Svelte 5
- Tailwind CSS v4 configured with @tailwindcss/vite plugin
- Drizzle ORM schema defining unified entries table
- Database scripts for schema management (db:push, db:generate, etc.)
- All dependencies installed (better-sqlite3, nanoid, zod)
## Task Commits
Each task was committed atomically:
1. **Task 1: Create SvelteKit project with dependencies** - `3a2e0f2` (feat)
2. **Task 2: Configure Drizzle schema with entries table** - `63c5e4b` (feat)
## Files Created/Modified
- `package.json` - Project dependencies and db scripts
- `vite.config.ts` - Tailwind plugin configuration
- `src/app.css` - Tailwind import
- `src/routes/+layout.svelte` - CSS import and layout
- `src/routes/+page.svelte` - Test page with Tailwind classes
- `src/lib/server/db/schema.ts` - Drizzle schema with entries table
- `src/lib/server/db/index.ts` - Database connection with WAL mode
- `drizzle.config.ts` - Drizzle kit configuration
## Decisions Made
- Used Tailwind CSS v4 with @tailwindcss/vite (latest approach, not PostCSS)
- Unified entries table with type discriminator ('task' | 'thought') rather than separate tables
- SQLite with better-sqlite3 for simple single-file database
- WAL mode enabled for better read concurrency
## Deviations from Plan
None - plan executed exactly as written.
## Issues Encountered
- `sv create` interactive prompts required CLI flags (--no-add-ons, --no-dir-check)
- drizzle-kit push requires data directory to exist first (created manually)
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
- Foundation complete with all dependencies
- Database schema ready for CRUD operations
- Ready for Plan 02 (API endpoints) and Plan 03 (UI components)
---
*Phase: 01-foundation*
*Completed: 2026-01-29*