4aa0de9d1d docs(09-02): complete unit and component tests plan
Tasks completed: 3/3
- Write unit tests for highlightText and parseHashtags utilities
- Write browser-mode component tests for 3 Svelte 5 components
- Configure coverage thresholds with baseline

SUMMARY: .planning/phases/09-ci-pipeline/09-02-SUMMARY.md
2026-02-03 23:38:35 +01:00
Thomas Richter
623811908b docs(09-01): complete Vitest infrastructure plan
Tasks completed: 3/3
- Install Vitest dependencies and configure multi-project setup
- Create SvelteKit module mocks in setup file
- Write sample test to verify infrastructure

SUMMARY: .planning/phases/09-ci-pipeline/09-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 23:30:46 +01:00
Thomas Richter
d248cba77f docs(08-03): complete observability verification plan
Tasks completed: 3/3
- Deploy TaskPlanner with ServiceMonitor and verify Prometheus scraping
- Verify critical alert rules exist
- Human verification checkpoint (all OBS requirements verified)

Deviation: Fixed Loki datasource conflict (isDefault collision with Prometheus)

SUMMARY: .planning/phases/08-observability-stack/08-03-SUMMARY.md
2026-02-03 22:45:12 +01:00
Thomas Richter
de82532bcd docs(08-02): complete Promtail to Alloy migration plan
Some checks failed
Build and Push / build (push) Has been cancelled
Tasks completed: 2/2
- Deploy Grafana Alloy via Helm (DaemonSet on all 5 nodes)
- Verify log flow and remove Promtail

SUMMARY: .planning/phases/08-observability-stack/08-02-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 22:13:22 +01:00
Thomas Richter
c6aa762a6c docs(08-01): complete TaskPlanner metrics and ServiceMonitor plan
Tasks completed: 2/2
- Add prom-client and create /metrics endpoint
- Add ServiceMonitor to Helm chart

SUMMARY: .planning/phases/08-observability-stack/08-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 22:07:43 +01:00
Thomas Richter
6a88c662b0 docs(07-02): complete GitOps verification plan
Tasks completed: 3/3
- Test auto-sync by pushing a helm change
- Test self-heal by deleting a pod
- Checkpoint - Human verification (approved)

Phase 7 (GitOps Foundation) complete.
SUMMARY: .planning/phases/07-gitops-foundation/07-02-SUMMARY.md
2026-02-03 20:01:20 +01:00
Thomas Richter
d5fc8c8b2e docs(07-01): complete ArgoCD registration plan
Some checks failed
Build and Push / build (push) Has been cancelled
Tasks completed: 3/3
- Create ArgoCD repository secret for TaskPlanner
- Update and apply ArgoCD Application manifest
- Wait for sync and verify healthy status

SUMMARY: .planning/phases/07-gitops-foundation/07-01-SUMMARY.md
2026-02-03 15:28:27 +01:00
Thomas Richter
27ed813413 docs: create milestone v2.0 roadmap (3 phases)
Phases:
7. GitOps Foundation: ArgoCD installation and configuration
8. Observability Stack: Prometheus/Grafana/Loki + alerts
9. CI Pipeline Hardening: Vitest, Playwright, type checking

All 17 requirements mapped to phases.
2026-02-03 14:41:43 +01:00
Thomas Richter
6cdd5aa8c7 docs: start milestone v2.0 Production Operations 2026-02-03 03:14:14 +01:00
Thomas Richter
37023b2605 docs: complete milestone v1.0 archival
- Archive roadmap, requirements, and audit to .planning/milestones/
- Update PROJECT.md with validated requirements and decisions
- Reset STATE.md for next milestone cycle
- Create MILESTONES.md for project history

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-01 17:15:53 +01:00
Thomas Richter
4abff06d26 docs(06-02): complete runtime configuration plan
Tasks completed: 3/3
- Create health check endpoint
- Create environment documentation and backup script
- Add Docker deployment section to README

SUMMARY: .planning/phases/06-deployment/06-02-SUMMARY.md
2026-02-01 13:25:23 +01:00
Thomas Richter
8947ba30f0 docs(06-01): complete docker configuration plan
Tasks completed: 3/3
- Switch to adapter-node with environment prefix
- Create Docker configuration files
- Update data paths for environment variable configuration

SUMMARY: .planning/phases/06-deployment/06-01-SUMMARY.md
2026-02-01 13:21:52 +01:00
Thomas Richter
311bfeaca4 docs(05-03): complete search integration plan
Tasks completed: 3/3
- Create recent searches store and add dropdown UI
- Integrate filtering into EntryList with flat list mode
- Add highlighting to EntryCard and integrate search UI

SUMMARY: .planning/phases/05-search/05-03-SUMMARY.md
2026-01-31 17:20:10 +01:00
Thomas Richter
6090d78824 docs(05-01): complete search UI components plan
Tasks completed: 3/3
- Create search types and utility functions
- Create SearchBar component with debounced input
- Create FilterBar component with type, tag, date controls

SUMMARY: .planning/phases/05-search/05-01-SUMMARY.md
2026-01-31 17:14:42 +01:00
Thomas Richter
628312dbd9 docs(05-02): complete filtering utilities plan
Tasks completed: 2/2
- Create filterEntries utility function
- Create highlightText utility function

SUMMARY: .planning/phases/05-search/05-02-SUMMARY.md
2026-01-31 17:13:47 +01:00
Thomas Richter
e924839ee4 docs(04-03): complete tag input UI plan
Tasks completed: 2/2
- Install Svelecte and update load/actions for tags
- Create TagInput component and integrate into EntryCard

SUMMARY: .planning/phases/04-tags/04-03-SUMMARY.md
2026-01-31 13:10:39 +01:00
Thomas Richter
66fc04efe7 docs(04-01): complete tag schema and repository plan
Tasks completed: 2/2
- Add tags schema with case-insensitive unique index
- Create tagRepository with tag operations

SUMMARY: .planning/phases/04-tags/04-01-SUMMARY.md
2026-01-31 13:05:30 +01:00
Thomas Richter
7539d1591a docs(04-02): complete pin/favorite and due date plan
Tasks completed: 2/2
- Add togglePin and updateDueDate form actions
- Add pin button, due date picker, and pinned section UI

SUMMARY: .planning/phases/04-tags/04-02-SUMMARY.md
2026-01-31 13:05:04 +01:00
Thomas Richter
c78330ad35 docs(03-04): complete gallery integration plan
Tasks completed: 4/4
- ImageGallery and ImageLightbox components
- Integrate images into EntryCard
- Delete image form action
- Human verification (approved)

Fix: Camera button replaced with file input capture="environment"

SUMMARY: .planning/phases/03-images/03-04-SUMMARY.md
2026-01-31 12:20:06 +01:00
Thomas Richter
0188483036 docs(03-02): complete file upload plan
Tasks completed: 3/3
- Add uploadImage form action with thumbnail generation
- Create ImageUpload component with drag-drop
- Integrate upload into QuickCapture

SUMMARY: .planning/phases/03-images/03-02-SUMMARY.md
2026-01-29 15:29:35 +01:00
Thomas Richter
19d2059c56 docs(03-03): complete camera capture plan
Tasks completed: 2/2
- CameraCapture component with getUserMedia
- Feature detection and graceful fallback

SUMMARY: .planning/phases/03-images/03-03-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-29 15:29:07 +01:00
Thomas Richter
e442b9ef0c docs(03-01): complete image infrastructure plan
Tasks completed: 3/3
- Database schema and repository for images
- File storage and thumbnail generation utilities
- API endpoints for serving images

SUMMARY: .planning/phases/03-images/03-01-SUMMARY.md
2026-01-29 15:24:35 +01:00
Thomas Richter
6413c8e2d6 docs(02-04): complete mobile UX plan
Tasks completed: 2/2
- Install svelte-gestures and implement swipe-to-delete
- Mobile UX verification (checkpoint approved)

Phase 2 Core CRUD complete.
SUMMARY: .planning/phases/02-core-crud/02-04-SUMMARY.md
2026-01-29 14:28:38 +01:00
Thomas Richter
969b6a71af docs(02-03): complete inline editing plan
Tasks completed: 2/2
- Add expand/collapse and inline editing to EntryCard
- Create CompletedToggle component and wire up showCompleted

SUMMARY: .planning/phases/02-core-crud/02-03-SUMMARY.md
2026-01-29 11:14:09 +01:00
Thomas Richter
628f643197 docs(02-02): complete main UI components plan
Tasks completed: 3/3
- Install dependencies and create preferences store
- Create EntryCard and EntryList components
- Create QuickCapture component and integrate main page

SUMMARY: .planning/phases/02-core-crud/02-02-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-29 11:08:47 +01:00
Thomas Richter
e28ee2caf5 docs(02-01): complete CRUD form actions plan
Tasks completed: 3/3
- Extend repository with getOrdered method
- Create form actions for CRUD operations
- Establish accessible base styling

SUMMARY: .planning/phases/02-core-crud/02-01-SUMMARY.md
2026-01-29 11:04:11 +01:00
Thomas Richter
01a7a6230a docs(01): complete foundation phase
Phase 1: Foundation verified complete
- 2/2 plans executed
- 11/11 must-haves verified
- Goal achieved: data persistence and project structure ready

Ready for Phase 2: Core CRUD
2026-01-29 04:44:45 +01:00
Thomas Richter
f3fa1a07e9 docs(01-02): complete repository layer plan
Tasks completed: 2/2
- Create EntryRepository with typed CRUD operations
- Create data directory, server hooks, and verification page

SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-01-29 04:39:27 +01:00
Thomas Richter
4c2e8fe366 docs(01-01): complete project setup and database schema plan
Tasks completed: 2/2
- Task 1: Create SvelteKit project with dependencies
- Task 2: Configure Drizzle schema with entries table

SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
2026-01-29 04:35:31 +01:00
Thomas Richter
a5fe96ccab docs: create roadmap (6 phases)
Phases:
1. Foundation: data model, repository, project structure
2. Core CRUD: entries, quick capture, responsive UI (12 reqs)
3. Images: attachments, camera capture (4 reqs)
4. Tags & Organization: tagging, pin, due dates (7 reqs)
5. Search: full-text, filtering (4 reqs)
6. Deployment: Docker, volumes, config (4 reqs)

All 31 v1 requirements mapped to phases.