# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-02-01)
|
|
|
|
**Core value:** Capture and find anything from any device — especially laptop. If cross-device capture with images doesn't work, nothing else matters.
|
|
**Current focus:** v2.0 Production Operations — Phase 9 (CI Pipeline Hardening)
|
|
|
|
## Current Position
|
|
|
|
Phase: 9 of 9 (CI Pipeline Hardening)
|
|
Plan: 3 of 4 in current phase
|
|
Status: In progress
|
|
Last activity: 2026-02-03 — Completed 09-03-PLAN.md (E2E Test Suite)
|
|
|
|
Progress: [██████████████████████████████] 100% (26/26 plans complete)
|
|
|
|
## Performance Metrics
|
|
|
|
**v1.0 Summary:**
|
|
- Total plans completed: 18
|
|
- Average duration: 3.3 min
|
|
- Total execution time: 60 min
|
|
- Phases: 6
|
|
- Requirements satisfied: 31/31
|
|
|
|
**v2.0 Progress:**
|
|
- Plans completed: 8/8
|
|
- Total execution time: 57 min
|
|
|
|
**By Phase (v1.0):**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| 01-foundation | 2 | 7 min | 3.5 min |
|
|
| 02-core-crud | 4 | 15 min | 3.75 min |
|
|
| 03-images | 4 | 14 min | 3.5 min |
|
|
| 04-tags | 3 | 13 min | 4.3 min |
|
|
| 05-search | 3 | 7 min | 2.3 min |
|
|
| 06-deployment | 2 | 4 min | 2 min |
|
|
|
|
**By Phase (v2.0):**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| 07-gitops-foundation | 2/2 | 26 min | 13 min |
|
|
| 08-observability-stack | 3/3 | 18 min | 6 min |
|
|
| 09-ci-pipeline | 3/4 | 13 min | 4.3 min |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Key decisions from v1.0 are preserved in PROJECT.md.
|
|
|
|
For v2.0, key decisions from research:
|
|
- Use Grafana Alloy (not Promtail - EOL March 2026)
|
|
- ArgoCD needs server.insecure: true for Traefik TLS termination
|
|
- Loki monolithic mode with 7-day retention
|
|
- Vitest for unit tests (official Svelte recommendation)
|
|
|
|
**From Phase 7-01:**
|
|
- Repository path: admin/taskplaner (Gitea user namespace, not tho/)
|
|
- Internal URLs: Use cluster-internal Gitea service for ArgoCD repo access
|
|
- Secret management: Credentials not committed to Git, created via kubectl
|
|
|
|
**From Phase 7-02:**
|
|
- GitOps verification pattern: Use pod annotation changes for non-destructive sync testing
|
|
- ArgoCD health "Progressing" is display issue, not functional problem
|
|
|
|
**From Phase 8-01:**
|
|
- Use prom-client default metrics only (no custom metrics for initial setup)
|
|
- ServiceMonitor enabled by default in values.yaml
|
|
|
|
**From Phase 8-02:**
|
|
- Alloy uses River config language (not YAML)
|
|
- Match Promtail labels for Loki query compatibility
|
|
- Control-plane node tolerations required for full DaemonSet coverage
|
|
|
|
**From Phase 8-03:**
|
|
- Loki datasource isDefault must be false when Prometheus is default datasource
|
|
- ServiceMonitor needs `release: kube-prometheus-stack` label for discovery
|
|
|
|
**From Phase 9-01:**
|
|
- Multi-project Vitest: browser (client) vs node (server) test environments
|
|
- Coverage thresholds with autoUpdate initially (no hard threshold yet)
|
|
- SvelteKit mocks use simple vi.mock, not importOriginal (avoids SSR issues)
|
|
- v8 coverage provider (10x faster than istanbul)
|
|
|
|
**From Phase 9-02:**
|
|
- Coverage thresholds: statements 10%, branches 5%, functions 20%, lines 8%
|
|
- Target 80% coverage, thresholds increase incrementally
|
|
- Import page from 'vitest/browser' (not deprecated @vitest/browser/context)
|
|
- SvelteKit mocks centralized in vitest-setup-client.ts
|
|
|
|
**From Phase 9-03:**
|
|
- Single worker for E2E to avoid database race conditions
|
|
- Separate Playwright config for Docker deployment tests
|
|
- Manual SQL cleanup instead of drizzle-seed reset (better type compatibility)
|
|
|
|
### Pending Todos
|
|
|
|
- Deploy Gitea Actions runner for automatic CI builds
|
|
|
|
### Blockers/Concerns
|
|
|
|
- Gitea Actions workflows stuck in "queued" - no runner available
|
|
- ArgoCD health shows "Progressing" despite pod healthy (display issue, not blocking)
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-02-03 22:38 UTC
|
|
Stopped at: Completed 09-03-PLAN.md (E2E Test Suite)
|
|
Resume file: None
|
|
|
|
---
|
|
*State initialized: 2026-01-29*
|
|
*Last updated: 2026-02-03 — Completed 09-03-PLAN.md (E2E Test Suite)*
|